Construction Capability

General Construction Project Capability

Defined building-related alteration, repair and improvement coordinated with the actual site requirement.

General Construction

Capability Overview

How This Type of Project Can Be Scoped

General construction should be described by the actual work rather than by a broad label. Dimensions, existing construction, access, surrounding occupied areas and any specialist or regulated requirements need to be identified before the method, materials and programme are finalised.

The confirmed work should be based on the actual property rather than on a pre-set package. Dimensions, existing conditions, retained items, access and the intended end condition can change the sequence and the work required.

Typical Work Scope

Activities That May Form Part of the Project

  • property alteration
  • repair and making-good
  • fixed installation support
  • removal and preparation
  • multi-trade coordination

Planning Considerations

Points to Confirm Early

  • drawings and measurements
  • existing construction
  • material access
  • specialist requirements where applicable

Only relevant work should be included. Specialist, regulated or property-specific requirements should be identified for the actual project where applicable.

Related Services

Services Commonly Connected to This Capability

Quotation Planning

Project Information Matters More Than a Generic Price

Quotation depends on the confirmed scope, site condition, dimensions, material requirements, access, removal and project complexity. For multi-trade work, the order of activities and the interfaces between them can also affect the final scope.

Provide the site address, property type, affected areas, current condition, intended result, preferred timing and useful drawings or measurements where available.