Construction Capability
General Construction Project Capability
Defined building-related alteration, repair and improvement coordinated with the actual site requirement.
Capability Overview
How This Type of Project Can Be Scoped
General construction should be described by the actual work rather than by a broad label. Dimensions, existing construction, access, surrounding occupied areas and any specialist or regulated requirements need to be identified before the method, materials and programme are finalised.
The confirmed work should be based on the actual property rather than on a pre-set package. Dimensions, existing conditions, retained items, access and the intended end condition can change the sequence and the work required.
Typical Work Scope
Activities That May Form Part of the Project
- property alteration
- repair and making-good
- fixed installation support
- removal and preparation
- multi-trade coordination
Planning Considerations
Points to Confirm Early
- drawings and measurements
- existing construction
- material access
- specialist requirements where applicable
Only relevant work should be included. Specialist, regulated or property-specific requirements should be identified for the actual project where applicable.
Related Services
Services Commonly Connected to This Capability
Quotation Planning
Project Information Matters More Than a Generic Price
Quotation depends on the confirmed scope, site condition, dimensions, material requirements, access, removal and project complexity. For multi-trade work, the order of activities and the interfaces between them can also affect the final scope.
Provide the site address, property type, affected areas, current condition, intended result, preferred timing and useful drawings or measurements where available.